Over the last ten years, EGIS Cameroon alone or in association with SCETAUROUTE and BCEOM (since 1999) or the other companies of the EGIS group have performed, among others missions- mainly in Cameroon but also in Central African Republic and in Equatorial Guinea- the following:

    STUDIES

Ø     Studies on consodilation of the Douala - Kékem road (160 km).(2001)

Cost: FCFA 66 349 359 FCFA (excl : VAT)

Financing: Road Capital

Ø   Rehabilitation and maintenance studies of the rural tracks for the northern region Chéloba - Mara and Goulfey - Hillélé. i.e. 100 km. (2001).

Cost: FCFA 13.950.000  

Financing: PDRP L&C (Program of Participative Development of the department of Logone and Chari)

Ø     Design and studies on the project for extension of  Malabo Airport (2001):

Cost: FCFA 39.000.000  

Financing: AFD

Ø   Road rehabilitation studies the and the purification of the Avenue. Dr JAMOT: block n°1

(2001)

Cost: FCFA 15 450 000  

                    Financing: CUD

Ø     Diagnosis studies for road rehabilitation  and the purification of the connection NDOGBONG / MAKEPE: Block n°10

In 2001

Cost: FCFA  66 000 000  

Financing: CUD

Ø     Studies of consolidation of the road GAROUA-MAROUA ( 2000-2001):

Cost: FCFA 55.282.650 

Financing: Road Capital

Ø     Studies of consolidation of the road MUTENGUENE-KUMBA  (2000):

Cost: FCFA 40.703.500 

Financing: Road Capital

 

Ø     Implementation of the Sangmélima - Awae, DJA loop project( SATOM) (1999):

Cost: FCFA  75.000.000 

Ø     Implementation studies for the NGOLBANG-ZOETELE road (1999):

Cost: FCFA 35.775.000 

Ø     Studies of pre-project of prizes(lots) of street of the city of Douala  (1996):

Financing: AFD

Ø     Studies of pre-project of KOUSSERI street  (1995):

Financing: FED

Ø     Studies of pre-project of the street of EBOLOWA, KUMBA, DSCHANG, MAROUA  (1993):

Financing: World Bank

Ø     Implementation studies for BANBUI-FUNDONG road by company TRAPP, Organized by the software MACAO on site  (1993)

Ø     Implementation studies for all the hydraulic works for ESEKA-LOLODORF road  (56 km) for the company ANDRADE-GUTTIEREZ

Ø     Implementation studies for drainage work to Douala - (PDU II)

 

Ø     With BCEOM: Pre-feasibility study of the coastal tracks of Cameroon ( 2001):

Cost: FCFA 62.832.500 

Financing: AFD

Ø     With BCEOM: Rehabilitation and organization of rural tracks / coastal province  (2001):

Cost: FCFA  15.596.500 

Financing: AFD

Ø    with SCETAUROUTE: Building supervision of road organization project for the Plain Tikar.

1997 - to 2001.

Cost: FCFA  772 570 338 

Financing: European Union

Ø     with SCETAUROUTE: preliminary project study for : Nsimalen-Mbalmayo / Ebolowa-Nkoemvon-Ambam roads / Border Gabon - Equatorial Guinea (1997):

Financing: French Development Fund

Ø     Jointly with SCETAUROUTE: Studies APD / DCE for the block n°4 - GAROUA-MAROUA of the emergency programme of road maintenance for the World Bank ( PUER-IDA) including analyses of offers (1997):

Financing: World Bank

Ø   Jointly with SCETAUROUTE: Implementation studies for the  YAOUNDE-AYOS road for  COGEFAR company (1993)

Ø    Jointly  with SCETAUROUTE:  preliminary project study for YAOUNDE / NANGA-EBOKO / BERTOUA road (1990-1992)

Ø     Jointly  with BCEOM: LEKIE:

Cost: FCFA 268.992.005

Financing: AFD

Ø     With BEAK The Road : Statement of damages:

Cost: FCFA 99.000.000

Financing: MINTP

Ø     Jointly with SCETAUROUTE and ECTA BTP: Feasibility studies on the ways of opening up  Douala industrial sites

Cost: FCFA   280 471 463 VOCATIONAL TRAINING CENTRE(CFA FRANC)

Financing: AFD

 

Ø    Land study for construction or rehabilitation of the building sites of the cashier's office of Valuable stabilization of Hydrocarbures ( CSPH).

In 2001.

Cost: FCFA 56 900 408 

Financing: CSPH

Ø  Design and studies on extension project of Malabo Airport  (2001):

Cost: FCFA  39.000.000fcfa

Ø     Construction of building GICAM  (2000):

Cost: FCFA 10.825.000fcfa

Financing: GICAM

Ø     Centre PASTEUR in Yaounde (1999):

Cost: FCFA  11.000.000 

Financing: CPC

Ø     "volière"school (1999):

Cost: FCFA 90.500.000 

Ø    Garoua  Roof / ADC's terminal  (1998) :

Cost: FCFA  70.868.500 

Financing : ADC

Ø     FUSTEL secondary school, control of the works covering all building tracks of the company NICAM for the construction of a multi-purpose hall ( 4 months) :

Cost: FCFA 40.000.000 

Financing : APE FUSTEL

Ø     Architecture and design study - Pre-Project-DCE of the banana trees and plantains centre of Njombe  (1995-1996) :

Cost: FCFA  450.000.000 

Financing : FED

Ø     implémentation studies on Hilton hotel in Yaounde for the company REYNOLDS in (1988-1989)

Ø     implémentation studies of Bafoussam stadium in 1987

Ø     implémentation studies on a ministry building for SATOM ( 18 storeys) in Yaounde (1985-1986)

Ø     Rehabilitation studies on the roof of Garoua international airport:

Financing : Cameroon airport

Ø     Studies on University project of DSCHANG, NGAOUNDERE, YAOUNDE centres

Ø     Design studies on  the Head office building of  Land loan of Cameroon

Ø     Design studies on the building Sites National company of the Hydrocarbons of Cameroon

Ø     Design studies for the building of Ekounou's ICY-campus

Ø     Design studies for an educational building of Nkolbisson's ICY-campus

Ø     Studies on extension of the Polytechnical school in Yaounde

 

Ø     Rehabilitation of the railway bridge over the Sanaga river, Pk 69   + 000 to Edéa: Expertise.

( 2001).

Cost: FCFA 17 300 000  

Financing: CAMRAIL

Ø     Bridge over the Lom:

(2001)

Cost: FCFA  10 800 000  

Financing: AFD

Ø     Salak bridge:

(1999)

Financing: FED

Ø     Makabaye bridge:

In 1999

Financing: FED

Ø     Studies of 35 hydraulic works from Douala to Ngaoundéré and preparation company consultation files (2001).

Cost: FCFA 36 990 000  

Financing: CAMRAIL

Ø     Elaboration of the study on preliminary detailed project and preparation consultation files for  the 4 technical works on Melong-Dschang road in Cameroon (length 30-44-50-50 metres) (1999)

Ø     CHINER.INT.WATER and ELECTRIC in 1999 :

Cost: FCFA  14.000.000 

Financing : CWE

Ø     implementation studies on Mayo-Boula bridge in Cameroon (length 50 metres) (1995)

Ø     File of call for tenders of the 4 technical works of the  Melong-Dschang road in Cameroon (1994)

Ø     design studies on the FAFA bridge (1993) :

Financing : Central African Republic

Ø     Implementation studies of Batouri water tower in 1986

Ø     Mouskwari dike / coop.cam-EEC